Cataraqui Centre Transit Transfer Point

We provided Detailed Design and Contract Administration and inspection services for this high-profile project with the City of Kingston and Kingston Transit.

Asphalt and Concrete Compliance Program Quality Assurance Testing

Since 2010, we have been providing Quality Assurance Testing for The City of Calgary’s Asphalt and Concrete Compliance Program.

Highway 2:15 Overhead Sign Structure Construction

This project involved the construction of overhead sign structures along Deerfoot Trail from south of the Douglasdale overpass to south of the Country Hills Boulevard overpass.

Highway 727:02 Spirit River

The project consisted of construction of a new alignment of Hwy 727 as the existing alignment was sliding and was becoming impassible.

BF 7721, Standard Bridge Replacement

We were retained by Alberta Transportation to plan and design a 2-span precast concrete bridge to replace the existing 3-span bridge structure.

Highway 43:00

McIntosh Perry was selected to provide engineering services for the realignment of Highway 43 and adjacent CN Rail line around the community of Beaverlodge, AB.

Highway 63:04 Twinning Wandering River

We performed accelerated twinning of Highway 63 as part of the Alberta government’s commitment to building Alberta’s economic future.

Highway 58:06 The Sixth Meridian

As part of the overall widening of Highway 58 from Rainbow Lake to High Level, we completed the design and project management of the last remaining section of Highway 58 to be widened from km 24.000 to km 71.005.

Highway 43:06 Twinning Sturgeon Lake Indian Reserve

The project completes the more than 1,000km of four-laned highway from Grande Prairie to the Alberta-Montana border at Coutts, part of the CANAMEX Trade Corridor.

Kleinburg Parking Strategy

We are developing a forward-looking parking strategy to address future parking needs in the Kleinburg Village core.