Multi-Well Site Expansion/Modifications

McIntosh Perry has completed hundreds of wellsites over the years. We offer complete wellsite services, including detailed coordination and engineering, procurement, and regulatory work.

Solaris 1 and 2 at Metrogate

We performed a Performance Audit and Reserve Fund Study at Solaris 1 and 2 at Metrogate, a 39-storey condo development.

Jayar Sour Gas Plant

McIntosh Perry provided complete engineering (mechanical/process/civil/electrical), drafting, procurement and commissioning for this project from Front End Engineering Design (FEED) through to completion.

The Classic

We provided Building Restoration services for this 7-storey-high apartment building in Delta, BC.

6555 Falconer Drive – Mississauga, ON

We provided Geotechnical Investigation & Restoration services for pavements, curbs and sidewalks at 6555 Falconer Drive.

The Heartland Pipeline

The Heartland Pipeline consisted of a pipeline system approximately 47 kilometers long, (including laterals) between the client’s hydrogen plant in Strathcona County and a termination point north of the North Saskatchewan River.

Cataraqui Centre Transit Transfer Point

McIntosh Perry provided Detailed Design and Contract Administration and inspection services for this high-profile project with the City of Kingston and Kingston Transit.

Spirit River Sour Gas Plant

OEL Projects ​completed a major expansion, located in the Spirit River area/Charlie Lake formation in North Western Alberta.

Four Seasons Hotel and Condominium

We provided Building Quality Assurance services to the Four Seasons Hotel ​and Condominium, including Bulletin 19 services.

Strawberry Hill Estates

We provided Building Restoration services for these two 4-storey apartment buildings in Surrey, BC.

Ottawa Air Quality Monitoring Network

We provided Air Quality services for Environment and Climate Change Canada, and the Ontario Ministry of Environment, Conservation and Parks.

Highway 4 Bayfield River Bridge

We provided Transportation Structures services for Highway 4 Bayfield River Bridge, the fourth accelerated bridge construction project to be completed using the GiGo Bridge model.