4557 Hurontario Street – Mississauga, ON
We provided Geotechnical Pavement services for the entire property at 4557 Hurontario Street, Mississauga.
View Project

Amazon Fulfillment Centre, Ottawa
We provided Structural Engineering for the 1,020,000 sq. ft. Amazon Distribution Centre in Ottawa.
View Project

Amazon Warehouse
We provided Structural Engineering services, including design and review, for this innovative warehouse.
View Project

Asphalt and Concrete Compliance Program Quality Assurance Testing
Since 2010, we have been providing Quality Assurance Testing for The City of Calgary’s Asphalt and Concrete Compliance Program.
View Project

Asphalt Shingle Roof Replacement for York Region Condominium Corporation 646
We provided an asphalt shingle roof replacement for seven two-storey buildings containing a total of 37 office units.
View Project

Assembly of First Nations Project Description
We carried out Building Condition Assessments (BCAs) of two Assembly of First Nations (AFN) communities: White River First Nation and Liard First Nation.
View Project

Aura at College Park
We provided Bulletin 19 Field Inspection services for Aura at College Park, one of the tallest buildings in Canada.
View Project

Aviation Parkway
We provided Preliminary Design to determine the alternative for the rehabilitation/replacement of 15 bridges and 14 structural culverts on Highway 417.
View Project

Baxter North Subdivision
We provided Grading and Servicing, Stormwater Management, Road Design, Construction Inspection and Contract Administration for a subdivision in Kingston.
View Project

Beachview Tower
We provided Project Management and Contract Administration for the window replacement of this 13-storey apartment building in Vancouver.
View Project

Bellevue Village Towers
We provided Building Restoration services for this 11-storey building in West Vancouver, BC.
View Project

Beth Tzedec Congregation
We performed a Building Condition Assessment and Reserve Fund Study on the present condition of the Beth Tzedec Congregation.
View Project

BF 7721, Standard Bridge Replacement
We were retained by Alberta Transportation to plan and design a 2-span precast concrete bridge to replace the existing 3-span bridge structure.
View Project

Big Bay Point Road Painswick Bridge Rehabilitation
McIntosh Perry was retained by the City of Barrie to provide detailed design services for the rehabilitation of the Big Bay Point Road Painswick Bridge. The structure carries two lanes of westbound traffic over the Metrolinx corridor in the City of Barrie. The structure was constructed in the mid-1970s, having undergone a previous rehabilitation in […]
View Project

Blue Diamond Condos
We conducted Phase One and Two ESAs, HSAs and Geotechnical Investigations for the property located at 129 St. Clair Avenue West, Toronto, Ontario.
View Project

Bridge 5 Replacement
We worked with Six Nations of the Grand River on the replacement of Bridge 5, located in Ohsweken, near Brantford, Ontario.
View Project

Bridge 9 Rehabilitation
We worked with the Six Nations of the Grand River to provide engineering services for the rehabilitation of Bridge 9, located in Ohsweken, Ontario.
View Project

Building Condition Assessments for 121 Municipal Facilities
We provided the City of Guelph with Building Condition Assessments for 121 municipal facilities.
View Project

Building Condition Assessments for Capital Region Housing
We provided Building Condition Assessments for affordable housing developments in Edmonton, Alberta.
View Project

Building Condition Assessments for City of Revelstoke
We provided the City of Revelstoke with Building Condition Assessments for approximately 40 facilities.
View Project

Building Condition Assessments for City of Welland
McIntosh Perry provided the City of Welland with Building Condition Assessments for 74 facilities including City Hall, Welland Museum, recreation facilities, transit facilities, and maintenance facilities. Reports included a 20-year capital expenditure plan. Ask us how we can help with your next project. Call toll free 1-888-348-8991. Contact Us Online
View Project

Building Condition Assessments for County of Haliburton
We provided the County of Haliburton with Building Condition Assessments for two buildings and three public works yards.
View Project

Building Condition Assessments for County of Northumberland
We provided Building Condition Assessments for 11 subsidized housing providers in the County of Northumberland, Ontario.
View Project

Building Condition Assessments for EPCOR Water Services Canmore
We provided Building Condition Assessments for sixteen wastewater facilities in Canmore, Alberta.
View Project

Building Condition Assessments for Government of Saskatchewan
We provided the Government of Saskatchewan with Asset Validation Surveys (Building Condition Assessments) for several facilities.
View Project

Building Condition Assessments For Over 150 Facilities
We are providing the City of Brampton with BCAs, accessibility audits, and energy audits for approximately 150 facilities over a three-year period.
View Project

Building Condition Assessments for Town of Gravenhurst
We provided Building Condition Assessments of three town facilities in Gravenhurst, Ontario.
View Project

Building Condition Assessments for Town of Midland
We provided the Town of Midland with Building Condition Assessments.
View Project

Burlington Skyway Bridge
We provided the design for the scaffolding used to repair the Burlington Skyway Bridge at the S1 & N1 pier locations.
View Project

Cataraqui Centre Transit Transfer Point
We provided Detailed Design and Contract Administration and inspection services for this high-profile project with the City of Kingston and Kingston Transit.
View Project

Class 2 Reserve Fund Study for Metropolitan Toronto Condominium Corporation 1381
We performed a Class 2 Reserve Fund Study for a 4-storey building containing luxury residential units and a single-level underground parking garage.
View Project

Class 2 Reserve Fund Study for Simcoe Standard Condominium Corporation 307
We performed a Class 2 Reserve Fund Study for 32 single residential dwellings, private road/walkways, underground utilities and other site components.
View Project

Class 3 Reserve Fund for York (Toronto) Condominium Corporation 56
We performed a Class 3 Reserve Fund Study for a 18-storey condominium originally built in 1971.
View Project

Class 3 Reserve Fund Study for York Region Standard Condominium Corporation 1133
We provided a Class 3 Reserve Fund Study for 71 commercial industrial units, private road/walkways, and underground utilities.
View Project

Class Environmental Assessment for the Expansion of the Alexandria Lagoons
We completed a Schedule ‘C’ Municipal Class EA to address capacity issues with the Alexandria Sewage Lagoon System.
View Project

Colonel By Drive Catch Basin Lead Replacements, Rideau Canal, Ottawa
The City of Ottawa retained McIntosh Perry to provide engineering services for the expedited rehabilitation of several catch basin leads along Colonel By Drive from Mount Pleasant Avenue to the south end of the wall section near Avenue Road. The project directly impacted the Rideau Canal, a National Historic Site of Canada, Canadian Heritage River […]
View Project

Compaction Room Modifications
We provided restoration consulting services for the new garbage door installation at 111 Chestnut St, Toronto, ON.
View Project

Conserve Blanding’s Turtle During Road Improvement Activities
We used conservation dogs to protect the Blanding’s Turtle and reduce the throwaway costs of installing silt fencing to exclude turtles from the work area or delaying construction.
View Project

Correctional Service Canada Parking Lot Expansion
We provided Procurement Documents, Construction Inspection and Design services for an existing parking lot expansion at a CSC building in Kingston.
View Project

Deloro Mine Clean-Up
We provided Professional Engineering services related to the clean-up work of Deloro Mine and was awarded The Willis Chipman Award.
View Project

Detailed Design of John Street Multi-Use Pathway
We were been retained by the City of Markham to develop the detailed design of a 4 km long multi-use pathway (MUP) along John Street and Esna Park Drive in Markham, Ontario.
View Project

Detailed Design of John Street Over CN Rail Bridge and Other Bridges and Culverts
We provided Detailed Design, Site Investigations and Condition Surveys for 11 roadways, bridges and culverts.
View Project
Ducks Unlimited Canada Project Infrastructure Inspections for 250 Sites in Ontario
McIntosh Perry completed the Ducks Unlimited Canada Project Infrastructure Inspections for 250 Sites in Ontario which provided crucial habitats and benefits to local wildlife. The objective was to classify each dam’s condition and potential hazards, and large-scale analysis required the coordination of multiple departments to conduct field and desktop investigations. Our team confirmed that the […]
View Project

ENN Canada Corporation – Environmental Investigation: Phase l & ll ESAs
We conducted an Environmental Site Investigation that included Phase I and Phase II ESAs.
View Project

Environmental Investigation: Phase l & II ESAs
We were retained to conduct Phase One & Two ESAs, in accordance with O. Reg. 153/04, for the purpose of filing a RSC.
View Project

Existing Roof Replacement for H&R REIT
We provided roof replacement construction and contract administration for a single level commercial-industrial facility.
View Project

Exterior Fountain Rehabilitation For Shared Facilities
McIntosh Perry performed an exterior fountain rehabilitation project for the shared facilities Toronto Standard Condominium Corporations.
View Project

Facility Condition Assessments for Municipality of Meaford
We provided the Municipality of Meaford with Integrated Facility Condition Assessments in a two phase project.
View Project

Feasibility Study for Trail Extensions/Connections at Various Locations, City of Markham
We completed a review of missing links in the network to determine solutions that provide safe and convenient pedestrian/cyclist access to the neighborhoods and communities.
View Project

Fort Henry
We provided a complete asset management plan for the historic Fort Henry site in Kingston.
View Project

Foundation Wall Repairs for Toronto Community Housing
We provided Detailed Investigations, Tendering Documents, Construction and Contract Administration services for two blocks of two and three-storey buildings constructed in 1955.
View Project

Four Seasons Hotel and Condominium
We provided Building Quality Assurance services to the Four Seasons Hotel and Condominium, including Bulletin 19 services.
View Project

Fully Integrated Road Reconstruction of First Avenue in the Glebe
We provided Engineering services for the full road reconstruction of First Avenue in the Glebe in Ottawa, Ontario.
View Project

Gay Lea Distribution Facility – Freezer Building
We provided innovative structural engineering and design for the Gay Lea Distribution Facility, which won an Ontario Concrete Award in 2019.
View Project

Highway 2:15 Overhead Sign Structure Construction
This project involved the construction of overhead sign structures along Deerfoot Trail from south of the Douglasdale overpass to south of the Country Hills Boulevard overpass.
View Project

Highway 21, Bayfield River Bridge Replacement
We provided Total Project Management for Highway 21 Bayfield River Bridge, which involves a complete replacement of all existing bridge components. The new bridge will be a single-span steel arch structure, which will include two lanes, paved shoulders, and a sidewalk on the west side of the bridge.
View Project

Highway 4 Bayfield River Bridge
We provided Transportation Structures services for Highway 4 Bayfield River Bridge, the fourth accelerated bridge construction project to be completed using the GiGo Bridge model.
View Project

Highway 400, Replacement of Dunlop Street Underpass, Anne Street Underpass, and Sunnidale Road Underpass
McIntosh Perry has been retained by the Ministry of Transportation (MTO) to complete the detail design services and Class EA Group “B” study for the replacement of three bridges on Highway 400 at Dunlop Street, Anne Street and Sunnidale Road in the City of Barrie, Simcoe County. The new bridges will accommodate the future ultimate […]
View Project

Highway 401, Rehabilitation of Four Bridges and Three Culverts
McIntosh Perry provided detail design services to the Ministry of Transportation (MTO) for rehabilitation of the Liverpool Road Underpasses, the superstructure replacement of the Brock Road Overhead over Canadian National Railway (CNR) and Metrolinx corridors and rehabilitation of three concrete culverts to achieve an extension of service life. The scope of work included the inspection […]
View Project

Highway 417 Widening from Nicholas to Highway 417/O.R 174 Split
We provided Contract Admin services for the construction of a pedestrian bridge linking Coventry Road with the VIA Train Station.
View Project

Highway 43:00
McIntosh Perry was selected to provide engineering services for the realignment of Highway 43 and adjacent CN Rail line around the community of Beaverlodge, AB.
View Project

Highway 43:06 Twinning Sturgeon Lake Indian Reserve
The project completes the more than 1,000km of four-laned highway from Grande Prairie to the Alberta-Montana border at Coutts, part of the CANAMEX Trade Corridor.
View Project

Highway 49, Bay of Quinte Skyway Bridge
We provided Construction Administration including General Structural Specialist Engineer services for the Bay of Quinte Skyway Bridge.
View Project

Highway 58:06 The Sixth Meridian
As part of the overall widening of Highway 58 from Rainbow Lake to High Level, we completed the design and project management of the last remaining section of Highway 58 to be widened from km 24.000 to km 71.005.
View Project

Highway 63:04 Twinning Wandering River
We performed accelerated twinning of Highway 63 as part of the Alberta government’s commitment to building Alberta’s economic future.
View Project

Highway 727:02 Spirit River
The project consisted of construction of a new alignment of Hwy 727 as the existing alignment was sliding and was becoming impassible.
View Project

Hunt Club Road and Bridle Path Drive Infrastructure Improvements
We completed a roadway improvement design, including sight lines and widening, transit way and cycling lanes designs.
View Project

ICE Condos
We provided Bulletin 19 Field Inspection Services for two condo towers of 67 and 57 storeys, Toronto, ON.
View Project

Insitu Environmental Remediation of Groundwater
We provided Environmental services for the Insitu Remediation of a site in Milton, Ontario.
View Project

Jayar Sour Gas Plant
We provided complete Engineering, Drafting, Procurement and Commissioning Services for Jayar Sour Gas Plant from design through to completion.
View Project

Kaslo Gardens Housing Co-Operative
We provided Building Restoration services for this 85 unit co-operative in Vancouver, BC.
View Project

Kleinburg (Vaughan) Village Parking Strategy Review
We are developing a forward-looking parking strategy to address future parking needs in the Kleinburg Village core.
View Project

Lake Ontario Shoreline Repairs – Kingston to Adolphustown
We provided a Preliminary and Detail Design study of the condition of the predominantly limestone shoreline adjacent to Highway 33 between the Glenora Ferry terminal and Collins Bay.
View Project

Leamington Traffic Study
We were retained to undertake a traffic study in the downtown of the Municipality of Leamington.
View Project

Limestone District School Board
We provided Assessment, Layout, Surveying, Design Drafting and Construction Inspection services for various Limestone District School Board properties in Kingston.
View Project

Margaret Laurence Housing Co-operative
We completed a Building Condition Assessment & Reserve Fund Study for Margaret Laurence Housing Coop, a 26 year old, 17-storey building.
View Project

Martin Grove Albion
We provided Building Restoration services for three-storey townhouse blocks containing 38 residential units in Toronto, ON.
View Project

Misty Ridge Housing Co-operative
We provided Building Restoration services for this 70 unit co-operative in Burnaby, BC.
View Project

Mountain View Co-operative Housing Association
We provided Building Restoration services for this 47 unit co-operative housing association in Vancouver, BC.
View Project

Mulligan Oil Battery
We were commissioned to complete the engineering and design work for a new sour multi-well oil battery in Alberta.
View Project

Multi-Well Gas Battery Expansion
We completed all four phases of expansion and modification to this brownfield site, upgrading the existing multi-well gas battery to a gas plant.
View Project

Multi-Well Site Expansion/Modifications
We have completed hundreds of well sites over the years, offering complete wellsite services, incl. detailed coordination and engineering, procurement and regulatory work.
View Project

One York
We provided a range of Building Quality Assurance services for a 35-floor, 800,000 sq. ft. Class AAA building in Toronto’s South Core Business District.
View Project

Ottawa Air Quality Monitoring Network
We provided Air Quality services for Environment and Climate Change Canada, and the Ontario Ministry of Environment, Conservation and Parks.
View Project

Ottawa Police Service Traffic Impact Assessment Study
We provided a traffic impact study for the Ottawa Police Service for its new facility at 55 Lodge Road, South Nepean, Ontario.
View Project

Ottawa South Integrated Road, Sewer, and Watermain Construction
We performed Contract Administration and Inspection services in cooperation with the City of Ottawa.
View Project

Palace Pier
We provided Project Management and Contract Administration services for various restoration, repairs, and Reserve Fund Studies.
View Project

Panorama Place
We performed a Building Enclosure Restoration project at Panorama Place, a 24-storey residential apartment tower in Vancouver.
View Project

Parking Study for City Owned Recreational Facilities
We were retained by the City of Kingston to undertake a parking study to review the parking requirements of five recreational facilities.
View Project

Performance Audit & Class 1 Reserve Fund Study for York Region Condominium Corporation 1406
We provided Building Services for a 2 and 6-storey building, residential suites, a townhouse block and underground parking garage.
View Project

Pinnacle Centre Condos
We provided Bulletin 19 Field Inspection Services for this 29-storey building in Toronto, ON.
View Project

Plan International Canada Head Office
We provided Mechanical Design and Contract Administration for a new 2-storey office space in a mid-rise building in Toronto.
View Project

Queen Elizabeth Way (QEW) & Highway 403 Interchange Expansion
We’re rehabilitating/replacing existing structures and the pavement on the QEW in the vicinity of the QEW/Highway 403/Ford Drive interchange.
View Project

Quinte Crane
We provided Planning, Surveying, Civil and Construction Inspection services for a crane storage and office building in Kingston.
View Project

Reed Narrows Bridge
We provided Transportation Structures services for the Reed Narrows Bridge, which is located on Highway 71 in Northwestern, Ontario and built in 1973. This project won a CEO Award of Merit in 2020.
View Project

Regina Airport Authority
We provided the Regina Airport Authority with Building Condition Assessments for 25 of their facilities.
View Project

Rehab Design of Brock Road Underpass
We provided Rehabilitation Design for five-span AASHTO girder structures at Hwy 401, Brock Road.
View Project

Rehabilitation of Highway 48 – Black River/Baldwin River Bridge, Durham
The Ministry of Transportation of Ontario (MTO) Central Region retained McIntosh Perry to complete a Detail Design and Group ‘C’ Class Environmental Assessment (Class EA) study for the rehabilitation of five structures on Highway 48 in the Town of East Gwillimbury and the Town of Georgina, Regional Municipality of York. McIntosh Perry was responsible for […]
View Project

Rehabilitation of the Pottery Road Vehicular Bridge Structures over the Don River
The City of Toronto (the City) is Canada’s most recognized urban city with a population of almost three million, along with many year-round tourists. With the high demands for sustainable infrastructure, the City must plan for its future needs. McIntosh Perry has been retained by the City to provide engineering consulting services for the pre-design, […]
View Project

Renovation and Alteration of Existing Industrial Warehouse for H&R REIT
We provided Structural Engineering and Restoration Consulting services for dividing an existing warehouse into two spaces for new tenants.
View Project

Replacement of Duchesnay Creek Bridge
We provided Contract Administration services for the replacement of the Duchesnay Creek Bridge.
View Project

Rideau Canal Backwater Structural Culvert Replacement
We provided Structural, Environmental, Traffic and Construction services for Rideau Canal Backwater Culvert.
View Project

Rouge National Urban Park
We were contracted to provide Legal Survey services for Rouge National Urban Park, Canada’s first National Urban Park when fully established.
View Project

Schedule ‘B’ Municipal Class Environmental Assessment Study, City of Thorold
We’re completing a review of missing links in the network to determine solutions that provide safe and convenient pedestrian/cyclist access to the neighborhoods and communities.
View Project

Schedule ‘C’ Municipal Class Environmental Assessment Study, City of Barrie
We’re providing the City of Barrie a Schedule ‘C’ Municipal Class Environmental Assessment Study for Dunlop Street West and associated intersections between Ferndale Drive and Anne Street.
View Project

Seasonal Roof Inspections for Greater Toronto Airports Authority
We provided the Greater Toronto Airports Authority (GTAA) with seasonal roof inspections over a contract period of three years.
View Project

Servicing Master Plan for the Town of Carleton Place
We prepared a serving Master Plan to assess future Municipal drinking water supply and wastewater infrastructure.
View Project

Shangri-La Toronto
We provided a range of services for this 68 floor luxury hotel and residential condominium in Toronto, Ontario.
View Project

Solaris 1 and 2 at Metrogate
We performed a Performance Audit and Reserve Fund Study at Solaris 1 and 2 at Metrogate, a 39-storey condo development.
View Project

Son’s Bakery – Brampton, ON
We provided Phase I and Phase II ESA at an industrial warehouse.
View Project

South Peel Water/Wastewater Treatment Facilities
We have been providing the Ontario Clean Water Association with Asbestos Surveys for seven of their water/wastewater treatment plants.
View Project

Spirit River Sour Gas Plant
We completed a major expansion, located in the Spirit River area/Charlie Lake formation in North Western Alberta.
View Project

Ste-Marie Hamlet in the Village of Embrun
We provided Engineering services for this multi-phased mixed used 500+ unit residential urban subdivision.
View Project

Strawberry Hill Estates
We provided Building Restoration services for these two 4-storey apartment buildings in Surrey, BC.
View Project

Synala Housing Co-operative
We provided Building Restoration services for this 40 unit co-operative in Vancouver, BC.
View Project

The Classic
We provided Building Restoration services for this 7-storey-high apartment building in Delta, BC.
View Project

The Heartland Pipeline
The Heartland Pipeline consisted of a pipeline system approximately 47km long, (including laterals) between the client’s hydrogen plant in Strathcona County and a termination point north of the North Saskatchewan River.
View Project

The Met 2
We performed a Class 2 Reserve Fund Study for a 33-storey building containing 334 residential units including guest suites and parking garage.
View Project

The Olympic Village (Le Village Olympique)
We provided Project Management and Building Restoration services for The Olympic Village, one of Montreal’s iconic landmarks.
View Project

Tim Hortons
We provided Civil, Traffic and Planning services for a Tim Hortons in Kingston, Ontario.
View Project

TRCA Scarborough Waterfront Project, Brimley Road South Multi-Use Trail Detailed Design
We’re developing a multi-use trail that enhances safety, while balancing the impact on natural surroundings and local wildlife.
View Project

Trinity Presbyterian Church
We completed a Building Condition Assessment & Reserve Fund Study for Trinity Presbyterian Church, originally constructed in 1953.
View Project

Tweedsmuir on The Park Co-Tenancy
We performed a Class 2 Reserve Fund Study for a 33 freehold townhouse units on two streets in Ottawa, Ontario.
View Project

Venture Seekers Welding
We helped a welding facility achieve Environmental Compliance Audit (ECA) by providing air quality monitoring services.
View Project

Walmart Freezer and Refrigeration Warehouse
We ensured that this large, efficient warehouse could be built at the right size and layout to create cost savings.
View Project

Waterclub Towers
We’ve been completing Reserve Fund Studies at this 37-storey, 431 unit condominium located in Toronto, since 2005.
View Project

Winston Churchill Blvd Bridge Replacement and Rehab of Four Bridges
We provided Detailed Design for the rehab and replacement of five structures at various locations.
View Project