McIntosh Perry carried out a condition assessment investigation for the existing asphaltic pavement, curb & concrete sidewalks and prepared the specifications for the restoration of 6555 Falconer Drive in Mississauga, Ontario.
- Total of 7,290 square metres of asphaltic pavement for the main roadway and units’ driveways that was completely renovated.
- Total of 1,250 linear metres of concrete curbs that was totally replaced.
- Total of 680 square metres of concrete sidewalks that were totally replaced.
Date of Project: 2018 – Present
Ask us how we can help with your next project. Call toll free 1-888-348-8991.